AAMA 501.2 Test at Hospital Clinic in Los Angeles
We were contracted to perform an AAMA 501.2 standardized test at this Los Angeles building. First of all, our test was actually in response to testing already performed which failed. In other words, we were to perform at the confirmation or re-test for this contractor. So, our testing was performed in the same manner as was the initial testing. Consequently, our tests also showed failure within some of the products tested. Much like the first test. However, our testing actually incorporated infrared thermography which the first tests did not.
After a few attempts to repair the conditions, we again re tested at which point everything tested passed.
AAMA 501.2 testing in Los Angeles
ASTM E1105 testing Los Angeles